Page 31 - 2022 - Q1 - Minerva in Focus
P. 31

HARD
                                                                                             HARD
                                                                                       WINTER
                                                                                        WINTER
                                                                           CONDITIONS
                                                                           CONDITIONS

                                                                                                       CAN

                                                                                                       NOT

                                                                                                     STOP
                                                                                   “SILICON PAINT

                                                                                      APPLICATION”

                                                                           AT SEFİNE SHIPYARD




                                                                                     Outside   Inside Covered Area
                                                                  Weather Temperature  -2 C°         5 C°

                                                                  Humidity            88%          67% - 70%




                                 Conversion Projects at Sefine Shipyard


                            M/V “CHALTYR”                                       M/V “KRISTINA P”


















              M/V  CHALTYR  has  been                                          The four center cranes are removed and
             taken  to  shore  by  using                                       two  side  cranes  are  installed.  This  is  the
             floating  dock  for  32,5  meters                                 9th  project  at  Sefine  Shipyard  for  the
             lengthening conversion proje-                                     same conversion work.
             ct at Sefine Shipyard.                                            Besides, two extra generators are fitted
                                                                               on   the   vessel   for   operate   these
                                                                               large-capacity cranes.
             The vessel is devided two parts and the new two prefabri-         By this way, the vessel will be able to be
             cated blocks (in total 300 tons) are fitted on shore. Hatch-      used  for  ship  to  ship  cargo  transfer  in
             cover  renewal  and  hatch  coaming  upgrade  works  are  in   Black  Sea.  The  river  type  vessels  will  bring  the  grain  from
             progress.                                           Russian rivers and then KRISTINA P, will transfer the cargo to
                                                                 bigger  vessels  at  sea  without  extra  costs  and  time  loss  of
                                                                 port.
              GET IN TOUCH
              CONTACT
                                                                   38/2 Business Street
              info@yourmail.com   facebook.com/name  Hersek Mah. İpekyolu Cad. No:7 Altınova-YALOVA/TURKEY
               Marketing@sefine.com.tr
              www.sitename.com    twitter.com/@name                Road #2, Californiya, USA
               shiprepair@sefine.com.tr              Tel: +90 226 815 36 36
               conversion@sefine.com.tr  @sefineshipyard  Fax: +90 226 815 36 37
   26   27   28   29   30   31   32   33   34   35   36