Page 47 - 2022 - Q2 - Minerva in Focus
P. 47

HARD
                                                                                               HARD

                                                                                        WINTER
                                                                                         WINTER
                                                                           CONDITIONS
                                                                           CONDITIONS

                                                                                                         CAN

                                                                                                         NOT

                                                                                                       STOP

                                                                                   “SILICON PAINT

                                                                                       APPLICATION”

                                                                            AT SEFİNE SHIPYARD




                                                                                      Outside    Inside Covered Area

                                                                 Weather Temperature   -2 C°          5 C°
                                                                 Humidity              88%           67% - 70%





                               Conversion Projects at Sefine Shipyard


                          M/V “CHALTYR”                                          M/V “KRISTINA P”



















          M/V  CHALTYR  has  been                                               The four center cranes are removed and
         taken  to  shore  by  using                                            two  side  cranes  are  installed.  This  is  the
         floating  dock  for  32,5  meters                                      9th  project  at  Sefine  Shipyard  for  the
         lengthening conversion proje-                                          same conversion work.
         ct at Sefine Shipyard.                                                 Besides, two extra generators are fitted
                                                                                on   the   vessel   for   operate   these
                                                                                large-capacity cranes.
          The vessel is devided two parts and the new two prefabri-             By this way, the vessel will be able to be
         cated blocks (in total 300 tons) are fitted on shore. Hatch-           used  for  ship  to  ship  cargo  transfer  in
         cover  renewal  and  hatch  coaming  upgrade  works  are  in   Black  Sea.  The  river  type  vessels  will  bring  the  grain  from
         progress.                                              Russian rivers and then KRISTINA P, will transfer the cargo to
                                                                bigger  vessels  at  sea  without  extra  costs  and  time  loss  of
                                                                port.
           GET IN TOUCH
           CONTACT

           info@yourmail.com    facebook.com/name                  38/2 Business Street
            Marketing@sefine.com.tr
                                                                   Road #2, Californiya, USA
           www.sitename.com     twitter.com/@name    Hersek Mah. İpekyolu Cad. No:7 Altınova-YALOVA/TURKEY
            shiprepair@sefine.com.tr                 Tel: +90 226 815 36 36
            conversion@sefine.com.tr  @sefineshipyard  Fax: +90 226 815 36 37
   42   43   44   45   46   47   48   49   50   51   52