Conversion Projects at Sefine Shipyard
M/V “CHALTYR” M/V “KRISTINA P”
M/V CHALTYR has been The four center cranes are removed and
taken to shore by using two side cranes are installed. This is the
floating dock for 32,5 meters 9th project at Sefine Shipyard for the
lengthening conversion proje- same conversion work.
ct at Sefine Shipyard. Besides, two extra generators are fitted
on the vessel for operate these
large-capacity cranes.
The vessel is devided two parts and the new two prefabri- By this way, the vessel will be able to be
cated blocks (in total 300 tons) are fitted on shore. Hatch- used for ship to ship cargo transfer in
cover renewal and hatch coaming upgrade works are in Black Sea. The river type vessels will bring the grain from
progress. Russian rivers and then KRISTINA P, will transfer the cargo to
bigger vessels at sea without extra costs and time loss of
port.
GET IN TOUCH
CONTACT
38/2 Business Street
info@yourmail.com facebook.com/name Hersek Mah. İpekyolu Cad. No:7 Altınova-YALOVA/TURKEY
Marketing@sefine.com.tr
www.sitename.com twitter.com/@name Road #2, Californiya, USA
shiprepair@sefine.com.tr Tel: +90 226 815 36 36
conversion@sefine.com.tr @sefineshipyard Fax: +90 226 815 36 37